A planning study is underway, called a 'Precise Roadway Plan', that will explore the impacts of the future widening of Grant Line Road to 4 lanes between Bond Road and Calvine Road. The Precise Roadway Plan is anticipated to complete in early 2022. The Precise Roadway Plan can be used to guide future design efforts.
The precise plan will prepare a preliminary level design in accordance with the City of Elk Grove General Plan, Rural Roads Improvement Standards, and Southeast Connector JPA Design Guidelines.
Extensive coordination with community members will advise the design, and a traffic analysis is being prepared. No construction activity is planned at this time.
The design of the 4-lane widening of Grant Line Road will identify necessary access modifications, intersection modifications, and the right-of-way needs for the future widening.
Previous efforts by the City in conjunction with the Connector JPA have identified several varied configurations of roadway improvements, but with direct input from community members, this study will refine those ideas into one cohesive design direction that can be taken forward by the City and the Connector JPA.
The precise plan will prepare a preliminary level design in accordance with the City of Elk Grove General Plan, Rural Roads Improvement Standards, and Southeast Connector JPA Design Guidelines.
Extensive coordination with community members will advise the design, and a traffic analysis is being prepared. No construction activity is planned at this time.
The design of the 4-lane widening of Grant Line Road will identify necessary access modifications, intersection modifications, and the right-of-way needs for the future widening.
Previous efforts by the City in conjunction with the Connector JPA have identified several varied configurations of roadway improvements, but with direct input from community members, this study will refine those ideas into one cohesive design direction that can be taken forward by the City and the Connector JPA.
CONCEPT RENDERINGS AND ANIMATION
Renderings and animation are based on concepts from the Precise Roadway Plan and are for visualization purposes only.
Renderings and animation are based on concepts from the Precise Roadway Plan and are for visualization purposes only.
INITIAL CONCEPTS AND PRESENTATION
An initial public meeting was held on September 17, 2020. Links to the presentation, project plans and a survey are below.
SECOND PUBLIC MEETING
The second public meeting was held on August 31, 2021. The presentation and project plans are available below:
The second public meeting was held on August 31, 2021. The presentation and project plans are available below:
- Presentation
- Grant Line Precise Roadway Project Plans